Fig 2: Top – details on the distribution details for the five parameters considered in the 1000 run virtual DOE ; Bottom – SEMulator3D Process Window Optimization interface showing target and standard deviation values for each of the five parameters studied to reach a 99.8% predictive in-spec percentage target